Archive for April, 2012

Upholstery Work

Upholstery work must be performed in accordance with the approved samples. Acceptance is made only after the complete drying of surfaces covered with shrink or pasted linkrusta. Quality upholstery work should meet the following requirements: the laminated surfaces should not be bubbles and blemishes, and all banners must have the same color and shade; fit the figure at the joints must be accurate; omissions and delamination not allowed; joints wallpaper with label their butt should not be visible at a distance of 3 m, with Wallcovering lap cloth edge should be facing towards the light (towards the windows); distortions, shriveled, looseness adjacency to the base (in places wallpaper contiguity to the slope of openings) are not permitted; edge glued wallpaper should be vertical; gluing wallpaper edges of the casings and baseboards are not allowed. Table. 44 listed ways to eliminate defects in upholstery work. Measurement made of upholstery work is performed on the surface is actually covered with a net area of door and window openings. table 44. methods of elimination of defects wallpaper works The cause of the defect Remedy Full or partial peeling wallpaper near the eaves Covering surfaces previously painted water-Kohler, too rapid drying out wallpapers from drafts or excessive furnace; weak thick paste with wallpaper wallpaper Perekleit Bubbles and wrinkles Slow drying: a strong paste with thin wallpaper; negligent smoothing Cut bubbles and wallpaper glue the inclined blades work without Plumb Perekleit curvilinearity figure Negligence in fitting the picture when gluing wallpaper – Thick seam pasting the old wallpaper without pre-cleaning welds; pasting overlap with dense wallpaper – Threads seams pasting overlap wallpaper was made for light – Pollution wallpaper, filled with edge glue seeping through the wallpaper in Negligence; smearing hot wallpaper paste – wallpaper Gaps in the corners of the walls by gluing the whole angle cloth without cutting it with an allowance of 2-3 cm right corner okleit lag wallpaper from casings and baseboards Places in casings and baseboards before Wallcovering not grease Grease and flour paste glue Germination color underlying Wallpaper Application of low-quality aniline dyes in the manufacture of wallpaper Remove old wallpaper glue paper and wallpaper paste over again solid blotches under the wallpaper glue or contaminated Clean the surface of solid particles and perekleit negligence in cutting edge Perekleit Wallpaper Ripped

Comments Off on Upholstery Work more...

Electricians

But do not be upset, a good specialist always find how to translate your dream into reality, or at least offer a decent alternative. It is important to realize that, behind your designer years experience, and if your idea was not appreciated, then there are reasons. The next stage – planning. Perhaps you do not know enough about the planning rules, electricians, air conditioning and ventilation or movement of the walls. But this does not mean that should lay down their arms and silently observe the work of the designer, afraid to express their views.

Tip 4: Planning electricians are not only placing receptacles and switches. Will need to add: Implications for the TV antenna, telephone, Internet. Do not forget, and implications for intercom or video intercom. In bathrooms should provide conclusions for the fans, for the spa. In the living room to think over before conclusions acoustics: decide exactly where you want the speakers, and as accurately as possible, specify a designer. It is worth remembering that in the kitchen outlets should be located in the basement kitchen. It is 50-60 mm from the finished floor.

It is best to take care of the technical conditions for location of outlets, coordinating them with the manufacturer of the kitchen. Planning outlet, remember the floor level: most likely he will change, so all the better to set the height from the finished floor. Do not forget the electric floor heating. His is envisaged, for example, in the hallways, bathrooms, kitchen. Next, follow the light.

Comments Off on Electricians more...

Ground Fireplace

The first series to spread from the basement fireplace or brick rubble dry. Stone or gravel vtrambovyvayut into the ground, and then pour a liquid solution. Next are laying in regular rows, respecting ligation joints. To prevent moisture penetration into masonry chimney on top of the basement, no less than 150 mm above the ground, make a layer of two layers of roofing, then perform the masonry fireplace. Housing fireplace often spread of refractory or high-quality red bricks. Housing fireplace is constructed of refractory bricks or red bricks of high quality – in this case, the firebox is better oblitsevat firebrick. Brick walls shall have a thickness of no less than a half-brick.

For building housing the fireplace, you can also use ceramic blocks, heat-resistant concrete or natural stone (except limestone and silica), depending on the the interior of your home, usually under fire adaptable interior room. "Facade," fireplaces can simply be plastered or oblitsevat precious stones. For building housing the fireplace, you can also use the natural stone (except limestone and silica), ceramic components, refractory concrete. Housing surface veneer precious stones or plaster. You will also need to build the firebox. Its depth is recommended take about 0.5 m. At greater depths weakens the power of thermal radiation, at least – perhaps getting smoke in the room. To achieve the best radiant heat the upper part of the back wall with some spread tilt forward and the side walls – with an extension towards the hole. The walls of his most often spread from fireclay refractory bricks, the efficiency of the fireplace reaches 17%.

Comments Off on Ground Fireplace more...


Deprecated: Function WP_Query was called with an argument that is deprecated since version 3.1.0! caller_get_posts is deprecated. Use ignore_sticky_posts instead. in /home/doctoran/public_html/losangelesdowntowncondos.com/wp-includes/functions.php on line 6114

Recent Posts

Copyright © 1996-2010 Los Angeles Downtown Condos. All rights reserved.
Jarrah theme by Templates Next | Powered by WordPress